SSSP Builder · New Zealand
Log in / My jobs
Pro export
01Site & project
When email is switched on, this contact can get an end-of-day summary of the day's pre-start checks and toolbox talks for this job.
02The job
Describe the work in plain English — what you're doing, what gear, what's around you. The more you say, the better the AI drafts.
Builds a starting hazard register you can edit. Review every line against the actual site.
03Hazards & controls
You own these controls. Drafted suggestions are a starting point, not site-specific advice. Check them against your real site, gear, and crew, and add anything that's missing.
04PPE required
Tap the gear that's mandatory on this site.
05Safe work method
Break the job into steps, with the hazards and controls for each. This is your SWMS / task analysis.
Turns the job into a sequence of steps with hazards and controls. Edit to match how you actually work.
06People & emergencies
Optional sections — add only what applies to this job
Site rules & induction
The short list of rules every worker is briefed on at induction.
Plant & equipment register
Plant and equipment on site and its inspection status. EWPs/scissor lifts, scaffold, harnesses and ladders need current inspection records.
Electrical test & tag register
Portable appliances and leads and their test status. AS/NZS 3760 is the NZ standard for in-service testing. Enter dates as dd/mm/yyyy.
Hazardous substances register
Hazardous substances kept or used on site (LPG, fuels, solvents, silica dust), their controls and whether an SDS is held.
Training, licences & competencies
The tickets the job needs. Common NZ examples: EWP/scissor-lift, scaffolding, hot work, confined space, first aid, Site Safe passport, asbestos.
Subcontractors & notifiable works
Subcontractors on site, plus any high-risk work. Some items (scaffold over 5m, excavation over 1.5m, asbestos, demolition, confined space, hot work) need notification to WorkSafe NZ and/or a permit.
High-risk / notifiable works on this job
Incident & near-miss reporting
Toolbox talk record
Log the on-site toolbox talks / safety briefings held for this job.
15Crew sign-off
List the crew. The printed plan leaves blank lines for them to sign on site, plus a few spares.
Everything updates the live plan on the right. When it looks right, hit Export PDF.
Site-Specific Safety Plan
Your company
Site address will appear here
Project
Prepared by
Start
Doc ref
SSSP-0001 · Rev A
01Scope of work
Describe the job and it'll show here.
02Hazard register
No hazards yet — add them or draft from the job.
03PPE required
No PPE selected yet.
04Safe work method statement
No method steps yet — add them or draft from the job.
05Key people
Site supervisor
First aider
06Emergency procedure
Nearest medical
Assembly point
In a life-threatening emergency, call111
07Site rules & induction
08Plant & equipment register
09Electrical test & tag register
10Hazardous substances register
11Training, licences & competencies
12Subcontractors & notifiable works
13Incident & near-miss reporting
14Toolbox talk record
15Crew sign-off
By signing, each person confirms they've been briefed on this plan and understand the hazards and controls before starting work.
NameRoleSignatureDate
This plan is a draft prepared for the site above. It must be reviewed, signed, and toolbox-briefed with the crew before work starts.
Drafted with CompliAI · compliai.co.nz